BREAKING: Eskom Escalates Load Shedding To Stage 4

According to Eskom, the escalation of load shedding from Stage 2 to Stage 4 comes after a unit each tripped at Majuba Power Station and Tutuka Power Station.

Unit 5 tripped at Majuba, while Unit 4 tripped at Tutuka.

This is a developing story. Further details will be added in due course.

Share on Facebook «||» Share on Twitter «||» Share on Reddit «||» Share on LinkedIn