According to Eskom, the escalation of load shedding from Stage 2 to Stage 4 comes after a unit each tripped at Majuba Power Station and Tutuka Power Station.
Unit 5 tripped at Majuba, while Unit 4 tripped at Tutuka.
This is a developing story. Further details will be added in due course.
Share on Facebook «||» Share on Twitter «||» Share on Reddit «||» Share on LinkedIn